To date, preparatory works has been carried out at the Orto-Tokoi reservoir. The mechanical equipment, the gear boxes in the emergency gate shaft are painted. Also the gear boxes of the right and left cone valves and all hydroposts are painted.
To date, preparatory works has been carried out at the Orto-Tokoi reservoir. The mechanical equipment, the gear boxes in the emergency gate shaft are painted. Also the gear boxes of the right and left cone valves and all hydroposts are painted.
State Water Resources Agency under Ministry of Agriculture, Forestry and Water Resources of the Kyrgyz Republic
Monday to Friday from 9:00 a.m to 6:00 p.m
Saturday Sunday
4 A Toktonalieva str.
720055, Bishkek, Kyrgyzstan
+996 312 54 90-95 (Reception)
+996 312 54 90-94