Preparatory works for the vegetation period of 2018, at the waterworks facilities in the Jalal-Abad oblast are fully completed. The following repair and rehabilitation works were carried out: repair of canals (31.5 km), mechanized cleaning of the canal (96.7 km), repair of hydraulic structures, repair of pumping stations and boreholes.